CESU Maintenance Work: Power Cuts In Cuttack, Bhubaneswar For Two Days

Bhubaneswar: The CESU has announced power cuts in these areas for maintenance-related works on Tuesday and Wednesday.

TUESDAY (10/12/2019)

Bhubaneswar Urban 

Mancheswar: 7 am to 10 am

Kalpana- I: 10 am to 4 pm

Bhubaneswar Rural

Phulnakhara: 7 am to 10 am

Naharakanta, Balianta: 10 am to 3 pm

Cuttack Urban

Medical, Mahandi Vihar : 9 am to 12 pm

Cuttack Rural

Athagarh: 8 am to 10.30 am

Nakhara and Salagaon Railway Station area: 9 am to 3 pm

Dhenkanal

Dhenkanal, Gondia: 9 am to 3 pm

WEDNESDAY (11/12/2019)

Bhubaneswar Urban

Saptasati Vihar, Pandara, Bank Colony: 9 am to 12 pm

Cuttack Urban

Sishubhawan, Sikharpur: 10 am to 12 pm

Cuttack Rural

Athagarh, Badamba, Kanpur, Gurudijhatia, Maniabandha, Balijhari: 8 am to 12 pm

Nuagaon, Ammanakuda, Kaliaghai, Adaspur: 10 am to 1 pm

Gopalpur, Urali, Tangi: 10 am to 4 pm

Adspur, Uttarana: 3 am to 5 pm

Dhenkanal

Mathakargola: 8 am to 12 pm

Bhuban, Kamakhyanagar, Hindol Road, Gondia, Joranda, Nihalprasad: 8 am to 2 pm

 

Comments are closed.